Drill the hole at least 1 4 inch deeper than the length of the lower portion and vacuum or blow out the hole.
How to attach cladding to a concrete wall.
Typically girts are spaced every 16 to 24 o c.
The tongue and groove edges of the panels connect to provide a.
The one shown requires only a 1 4 inch hole.
Position the panel next to the wall and press it into place.
Depending on the back up framing and cladding loads.
Use a level to plumb the panel before installing additional sections.
Drop in the anchor and hammer on the pin to expand the bottom of the shield against the wall of the hole.
Measure and cut your paneling pieces and try putting them in place before you apply the adhesive to insure the paneling will go on properly.
This cladding attachment consists of two continuous galvanized steel framing members typically 18 to 20 gauge z girt profiles attached in a crossing pattern to steel studs or a concrete back up wall.
A hammer drive anchor requires only a small pilot hole.